Version 2.5.0: Capacity Aware Planning

Version 2.5.0: Capacity Aware Planning

Version 2.5.0 · Released May 29, 2026 · Jira Cloud. Available now — no configuration required.

Version 2.5.0 is a major leap in how forecasting works. Until now, probabilistic release dates relied purely on raw historical throughput. With Capacity-Aware Planning, the Monte Carlo engine now understands real-world team constraints — discounting predictions based on who is actually working, scheduled time off, and work already in flight.

What's new

Intelligent, capacity-aware forecasting

  • Real-world adjustments: the forecast target shifts to reflect actual team capacity, current assignments, and outside commitments.

  • Smarter WIP modeling: WIP is treated as a one-time delay rather than a perpetual throughput penalty, tightening accuracy.

  • Responsive throughput window: throughput is measured over the last 4 active weeks (anchored to the most recently completed issue), so trailing dead weeks don't drag the forecast down.

  • Opt-in: Capacity Awareness toggles on or off per project.

Team-centric capacity modeling

  • Named-member teams assigned directly to products.

  • Absence tracking for PTO, headcount changes, and public holidays.

  • CSV holiday import — imported dates are treated as non-working days.

  • Locale-aware week-start on the capacity calendar.

The new Capacity Report

  • Flow metrics: cycle time, throughput, and WIP per team on a dedicated dashboard.

  • Workload by assignee with direct links out to Jira JQL searches.

  • Transparent math: click the throughput value to see every issue counted.

  • WIP slack indicators surface underutilized capacity when Capacity Awareness is on.

Board & scope refinements

Feature

Benefit

Feature

Benefit

Undo / redo

The board records your last 10 actions for instant undo/redo.

Draft releases

Stage and validate a release before writing it to Jira.

Smart cascading

Moving a feature cascades all its child issues automatically.

Context persistence

Your last-used prioritization method is remembered per login.

What's in this release

Type

Summary

Type

Summary

Feature

Capacity-aware Monte Carlo forecasting (PTO, holidays, WIP, headcount)

Feature

Named-member teams with per-member availability + CSV holiday import

Feature

Capacity Report: cycle time, throughput, WIP, workload by assignee

Improvement

One-time WIP delay model; 4-active-week throughput window

Improvement

Undo/redo, draft releases, and context persistence

Get started

Try it on the Atlassian Marketplace · Learn more on divim.io · User Guide · Book a 30-minute demo

Previous release: Version 2.0.0: Initial release.